Long Leads Upgrade Kit (AAMI) for PageWriter TC 70

Part #: 989803151771
Availability: In Stock
Write a Review
Your Price: $68.95
Most Popular
Best For Home
Best For School
Best For Business
Long Leads Upgrade Kit (AAMI) for PageWriter TC 70
Long Leads Upgrade Kit (AAMI) for PageWriter TC 70
  • Long Leads Upgrade Kit (AAMI) for PageWriter TC 70

Jump To:

Upgrade Kit 12-15/16 long leads AAMI - Diagnostic ECG Patient Cables and Leads. Long Upgrade Kit shielded 12-15/16 leads AAMI color-coded for PageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m0)), 6 shorting plugs, lead separators, 6 colored clips, 6 colored rings, 4 brown base rings, and instructions for use. The additional lead sets come pre-assembled with the brown base rings.

Why Shop AED Superstore?

FDA-Approved Devices

Subtotal: $0

Your Cart is Empty!
TOP
0 Items